Contracting
Contracting
APT Contracting has been in the field of the electrical contracting since 2010; our area of expertise covers the new electrical installation and renovation at the commercial, industrial, military, and institutional projects. We have built a great reputation of excellence in the electrical installation and renovation services, through our customers’ satisfaction with the product/service. We are confident in our ability to meet and exceed all of our customer expectations.
Our team consists of a professional engineer, with field electricians trained to perform the work professionally as per the required standards and safety procedures to meet the highest quality and customer satisfaction. By using the state of art testing equipment and the qualified engineers and electricians we can safely and quickly identify and solve all your electrical problems.
APT Contracting team is backed up with a strong expert management team, and technical office to provide the best installation procedures to meet our customer satisfaction and to complete the project in a timely manner.
Blocks 11&17 Total of 18 Buildings
Electrical Supply and Installation. The work included all the electrical supply and installation for the buildings starting from the main panel installation, risers, sockets, elevators feeders, and lighting fixtures
Blocks 27,28,29 Total of 14 Buildings
Electrical Supply and Installation. The work included all the electrical supply and installation for the buildings starting from the main panel installation, risers, sockets, elevators feeders, and lighting fixtures
Blocks 16 Total of 10 Buildings
Electrical Supply and Installation. The work included all the electrical supply and installation for the buildings starting from the main panel installation, risers, sockets, elevators feeders, and lighting fixtures
EFS Amazon Office – Electrical Work
The work included the electrical work at the Amazon office located at the HSBC building Maadi, and included cable tray installation, power cables, and new setup for the kitchen Equipment
Orascom Haram City Compound – Grounding System
The work included the installation of the new grounding network for all (27) unit substation. Each substation including RMU and step down transformer. The work performed to achieve grounding resistance less than 5 ohm.
NEW CAPITAL
Supply and Install all the electrical system starting from conduit in concrete, power system installation.
Enelectrical power system installation for the silos
The work included perform all the electrical power system installation for the silos project located at the El Hamam including all power cables installation and terminations, Transformers, Main electrical distribution boards, earting system, control system for the Silos operation, and all the lighting system for the overall project
Block 18 Total of 8 Buildings
Electrical Supply and Installation. The work included all the electrical supply and installation for the buildings starting from the main panel installation, risers, sockets, elevators feeders, and lighting fixtures
Emergency System Generators
Supply and Install Emergency System Generator complete with grounding system to support couple residential apartments along with all the cabling system, ATS panels and configurations. the work also included the muffler metal work extension. The work was performed for EL-Salam Interbuild, Janaklies Building.
Sporting Residential Building 11 Floors
Supply and Install all the electrical system starting from conduit in concrete, power system installation, light current installation along with the Emergency System Generator complete with grounding system to support the building service panel feeding stairs lighting, elevators, and all service electrical and mechanical equipment along with all the cabling system, ATS panels and configurations. the work also included the muffler metal work extension – Alexandria
AlexTend Compound (33 Buildings and Infrastructure)
The work included the overall electrical system supply and installation for the compound including all infrastructure, power network, and light current network. The compound is consisted of 33 Buildings, 4 Villas, Mall, and service building - Borg El Arab Alexandria