Testing & Commissioning

Testing & Commissioning

Commissioning new system or retrot project is a systematic process of ensuring that all building systems perform interactively according to the design intent, basis of design, contract documents and system operational needs. This is achieved by beginning in the design phase, documenting design intent and continuing through construction, building acceptance and the warranty period with actual verication of performance. APT Commissioning department is headed by high qualied engineers and technicians capable to provide full guarantee of success operation and full support to the client vendors insuring full satisfaction to the clients. APT provides commissioning services that follow a systematic process of ensuring all electrical systems perform interactively according to the design intent and the Owner's operational needs

Need Help? Call us!

+2 01279964343
ABB Factory Free Zone – Nasr City – Electrical check and IR Scanning.
Perform an electrical check of all the electrical network: panels, transformers, loads.
HSBC – Maadi Call Center Building – Maintenance Shutdown
HSBC Maadi & Smart village Buildings Maintenance Shutdown (2019, 2020, 2021 & 2022) for the overall building including all electrical system starting from the MV RMU. Transformers, Main Distribution Boards, Busways, LV Panels, STSs, UPSs, PDUs, and Earthing System.
Four season’s Hotels Sharm El Sheikh Annual Thermographic Study
Perform an electrical check of all the electrical network: panels, transformers, loads.
Central Bank Thermographic Scanning and Study
Perform an electrical check of all the electrical network: panels, transformers, loads.
Four season’s Hotels Cairo Annual Thermographic Study
Perform an electrical check of all the electrical network: panels, transformers, loads.
Alex American Consulate- IR Scanning & Power Quality Monitoring.
Electrical network general testing by performing an infrared scanning for all the electrical panels and preform a power quality monitoring study and analysis.
Iberotel Thermographic Scanning and Study
Perform an electrical check of all the electrical network: panels, transformers, loads.
Schneider Electric – SRMU – RTU – Testing and commissioning
Testing around 719 Smart Ring main Units using meggers, HI Pot, primary and second injection current devices.
Mantrac – Generator Load Transient Testing
Evaluate the efficiency of the generator using a load bank and by recording the generator output power with power quality logger at 25, 50, 75 and 100 % from the generator total power capacity.
Vodafone Egypt Earthing Testing
Perform earthing evaluation and testing for Vodafone Egypt main Buildings and MTXs.
Four season’s Hotels Alexandria Annual Thermographic Study
Perform an electrical check of all the electrical network: panels, transformers, loads.
HSBC – Smart Village Call Center Building – Maintenance Shutdown
HSBC Maadi & Smart village Buildings Maintenance Shutdown (2019, 2020, 2021 & 2022) for the overall building including all electrical system starting from the MV RMU. Transformers, Main Distribution Boards, Busways, LV Panels, STSs, UPSs, PDUs, and Earthing System .